Customization: | Available |
---|---|
Type: | Clay Wet Sand |
Casting Method: | Thermal Gravity Casting |
Still deciding? Get samples of US$ 80/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Product name | Sand casting parts |
Material | Grey iron / ductile iron |
Production process | Green sand casting or clay sand casting |
Surface treatment | Lightly oil, zinc plating, wet painting, powder painting, phosphating, black oxide, etc. |
Application industry | Farming machinery, construction machinery, transmission equipments, etc. |
Take the China quality to overseas, bring Created in China to the world. Driven by this firm belief, Baoding Longway Trading Co., Ltd aims to be the top professional machinery parts manufacturer.
We are committed to providing customers with high quality custom casting & forging machined parts and professional services.
Customer satisfaction is our greatest pursuit!
Professional Technique
Dedicated production and technique teams, advanced equipment are solid foundation of our high-quality products.
Integrated Resources
Powerful resourcing ability makes us to be a good bridge between customers and factories.
Quality Assurance
We have established a strict quality control system to ensure all delivered products are qualified.
Operation Flexibility
Flexible order quantity and process selection can meet different customer needs.
Exceeding Services
Consolidate services brings long-term business and customers' satisfaction and loyalty.
Sustainable Development
Commitment to meet environmental standards by producing in a sustainable way and with the conscious use of natural resources.
1. What information does the quotation need?
Please provide your drawings and/or samples, quantity and other necessary requirement.
Drawings can be in PDF, IGS, DWG, STEP format.
2. What's leading time for tooling, samples and mass production?
Lead time for tooling & samples: About 20-45days.
(Depends on the product structure and other requirements on heat treatment, machining, surface treatment and so on.)
Lead time for mass production: About 35~60days
(Depends on order quantity and other necessary post treatment or assembly accessories situation.)
3. What is the general quality control process?