Customization: | Available |
---|---|
Processing Object: | Metal |
Molding Style: | Forging |
Still deciding? Get samples of US$ 8.8/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Product | Sprocket gears |
Material | Carbon steel, Alloy steel |
Product process | Die forging |
Surface treatment | Anti-rust oil, sand blasting, powder painting, wet painting, zinc plating, etc. |
Part application industry | Farming machinery, construction machinery, transmission system, auto, gearbox, etc. |
Take the China quality to overseas, bring Created in China to the world. Driven by this firm belief, Baoding Longway Trading Co., Ltd was founded in 2014 as a professional machinery metal parts manufacturer & exporter.
We are committed to providing customers with high quality custom casting & forging machined parts and professional services.
Customer satisfaction is our greatest pursuit!
Professional Technique
Dedicated production and technique teams, advanced equipment are solid foundation of our high-quality products.
Integrated Resources
Powerful resourcing ability makes us to be a good bridge between customers and factories.
Quality Assurance
We have established a strict quality control system to ensure all delivered products are qualified.
Operation Flexibility
Flexible order quantity and process selection can meet different customer needs.
Exceeding Services
Consolidate services brings long-term business and customers' satisfaction and loyalty.
Sustainable Development
Commitment to meet environmental standards by producing in a sustainable way and with the conscious use of natural resources.
1. What information does the quotation need?
Please provide your drawings and/or samples, quantity and other necessary requirement.
Drawings can be in PDF, IGS, DWG, STEP format.
2. What's leading time for tooling, samples and mass production?
Lead time for tooling & samples: About 20-45days.
(Depends on the product structure and other requirements on heat treatment, machining, surface treatment and so on.)
Lead time for mass production: About 35~60days
(Depends on order quantity and other necessary post treatment or assembly accessories situation.)
3. What is the general quality control process?